From the finished job back to the start.
The finished roof
The completed white TPO roof, with heating and cooling units on curbs and gas lines resting on supports so nothing sits directly on the membrane.
The completed building
The new building from the ground, with the roof edge finished in metal trim.
Building the roof
Lifts give the crew access to the roof edge, and a safety line marks the perimeter while the roof goes on.
The new structure
Before roofing, the new building has a bare steel deck. Insulation boards and the TPO membrane are installed over it, with tapered insulation shaped to steer water toward the drains.












